API-580 Sample Questions Answers

Questions 4

With regard to initial assumptions in an RBI analysis, which of the following statements is correct?

Options:

A.

Consequence and probability estimates that are too conservative can result in unnecessarily inflated calculated risks.

B.

Consequence and probability estimates that are more conservative will result in less-intrusive inspections.

C.

Conservative consequence and probability estimates will be necessary to meet regulatory requirements.

D.

Conservative consequence and probability estimates result in fewer mitigation needs.

Buy Now
Questions 5

Which of the following statements is correct with regard to the potential reduction of inspection cost by using RBI?

Options:

A.

Equipment integrity is the focus.

B.

RBI will eliminate many internal inspections.

C.

On-stream inspections are as effective as internal inspections.

D.

RBI will probably raise the total cost of inspection for a given unit.

Buy Now
Questions 6

A likely trigger for an RBI reassessment would be after:

Options:

A.

API RP 580 Risk-Based Inspection has been updated.

B.

a mitigation strategy has been implemented.

C.

RBI team members have changed.

D.

a sensitivity analysis on the risk determination has been conducted.

Buy Now
Questions 7

The removal of piping deadlegs is an example of:

Options:

A.

modifying the process.

B.

mitigating the probability of failure.

C.

modifying physical design to control inventory.

D.

mitigating the consequence of failure.

Buy Now
Questions 8

Risk mitigation is defined as:

Options:

A.

estimated risk before and after repairs and replacements.

B.

finding, listing, and characterizing elements of risk management.

C.

modifying inputs to the risk matrix.

D.

selecting and implementing measures to modify risk.

Buy Now
Questions 9

During data collection, it is important to stress that the precision of the data collected should be consistent with what aspect of the RBI assessment?

Options:

A.

Accuracy

B.

Method

C.

Risk thresholds

D.

Sensitivity

Buy Now
Questions 10

What method of mitigation is most likely to reduce the amount and rate of release?

Options:

A.

Substitute a less hazardous material

B.

Emergency depressuring capability

C.

Water spray and deluge systems

D.

Spill detectors and containment

Buy Now
Questions 11

Clearly documenting the key assumptions made during an RBI assessment will:

Options:

A.

quantify the level of acceptable risk.

B.

identify the level of residual risk.

C.

allow recreation at a later date.

D.

demonstrate the precision of the assessment.

Buy Now
Questions 12

An iso-risk line on a risk plot is a line:

Options:

A.

of constant risk.

B.

of same-risk consequence.

C.

showing direction of increasing risk.

D.

of same-risk probability.

Buy Now
Questions 13

"Risk" is defined as the combination of the:

Options:

A.

probability of consequences from a failure event.

B.

probability of an event and its consequences.

C.

failure, loss of containment, and probability of ignition and/or injury.

D.

probability of failure from identified deterioration mechanisms and subsequent event.

Buy Now
Questions 14

Corrosion, cracking, and mechanical are all examples of what?

Options:

A.

Leaks

B.

Failure modes

C.

Failure mechanisms

D.

Damage mechanisms

Buy Now
Questions 15

The objective of RBI is to:

Options:

A.

determine what loss of containment incident could occur, and how likely the incident could occur.

B.

identify the worst possible consequences of a major leak or equipment failure, including safety, environmental, and/or economic consequences.

C.

determine the damage mechanisms that could occur and cause equipment failure that could lead to loss of containment.

D.

determine the likelihood that a major leak could result in a fire, an explosion, or another major consequence.

Buy Now
Questions 16

In terms of mitigating risk, which of the following is an example of an integrity operating window process parameter?

Options:

A.

Materials of construction

B.

Fluid velocity

C.

Vibration frequency

D.

Heat transfer

Buy Now
Questions 17

Which of the following has the most direct relation to the relative accuracy of the RBI analysis?

Options:

A.

Data precision

B.

Data quality

C.

Data sources

D.

Data validation

Buy Now
Questions 18

Which mitigation system most effectively minimizes community exposure to a significant release of an acidic water-soluble vapor cloud?

Options:

A.

Toxic scrubbers

B.

Acid detectors

C.

Blast resistance construction

D.

Water curtain

Buy Now
Questions 19

Before decisions are made based on risk analysis results, what should be done first?

Options:

A.

The risk analysis should be validated

B.

The inspection plan should be completed

C.

A sensitivity analysis should be completed

D.

The inspector shall approve the results

Buy Now
Questions 20

The RBI process is capable of generating a comparative ranking based on:

Options:

A.

relative risk.

B.

absolute risk.

C.

general risk.

D.

specific risk.

Buy Now
Questions 21

What is a risk driver?

Options:

A.

The primary contributor(s) responsible for a significant share of a risk value.

B.

The primary identifier(s) used to assist in the acceptance or mitigation of found damage.

C.

The primary element(s) to find, list, and characterize probability of failure.

D.

The primary element(s) to find, list, and characterize consequence of failure.

Buy Now
Questions 22

In the data collection stage, an assessment of what information is generally necessary?

Options:

A.

The type of RBI assessment that will be applied to the project

B.

The codes and standards in use for in-service inspection and evaluation

C.

What other types of risk assessment and mitigation have been applied to the equipment

D.

The risk thresholds that will be used to determine acceptable vs. unacceptable risks

Buy Now
Questions 23

RBI analysis requires a team approach primarily because:

Options:

A.

risk may be assessed differently for each equipment item.

B.

different levels of experience are essential to the process.

C.

maintenance and engineering must be involved in addition to inspection.

D.

one person typically does not have the background or skills to perform the entire analysis.

Buy Now
Questions 24

Risk evaluation is defined as the process used to:

Options:

A.

find, list, and characterize elements of risk.

B.

select and implement measures to modify risk.

C.

compare estimated risk against given risk criteria.

D.

assign values to the probability and consequence of risk.

Buy Now
Questions 25

What does sensitivity analysis typically involve?

Options:

A.

Checking the impact of having more than one damage mechanism progressing toward failure at the same time

B.

Determining whether a flammable release is more likely to result in an explosion versus a fire versus safe dispersion

C.

Reviewing some or all input variables to the risk calculation to determine the overall influence on theresultant risk value

D.

Determining what effect the surrounding community may have on the total consequence of the release to the environment

Buy Now
Questions 26

In RBI analysis, it is important to link the damage mechanism to the most likely resulting:

Options:

A.

failure mode.

B.

consequence.

C.

probability of failure.

D.

harmful event.

Buy Now
Questions 27

RBI plans identify equipment that does not require inspection or some other form of mitigation because of the acceptable level of risk associated with the equipment's current operation. In this way, inspection and maintenance activities can be:

Options:

A.

more focused and cost effective.

B.

eliminated for all low consequence equipment.

C.

conducted while the equipment is on-line instead of during turnarounds.

D.

shifted to more profitable needs in the plant.

Buy Now
Exam Code: API-580
Exam Name: API 580 - Risk Based Inspection
Last Update: Jun 24, 2025
Questions: 90
$66  $164.99