Weekend Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65percent

Welcome To DumpsPedia

PDD Sample Questions Answers

Questions 4

Which of the following metals is best suited for embedments in concrete or masonry?

Options:

A.

Stainless steel

B.

Bronze

C.

Aluminum

D.

Cast iron

Buy Now
Questions 5

Which of the following have natural resins that resist termite attack? (Check the two that apply)

Options:

A.

Douglas fir

B.

Red cedar

C.

Cypress

D.

Hemlock

E.

Southern yellow pine

F.

Oak

Buy Now
Questions 6

Given the information below, which of the following is the cost of 1,850 sq. ft. of brick veneer?

    Cost of brick – $500 per 1,000 brick

    Cost of masonry cement, sand, etc. – $160 per 1,000 brick

    Cost of labor – $675 per 1,000 brick

    680 bricks per 100 sq. ft.

    5% waste of material

Options:

A.

$15,520

B.

$16,794

C.

$17,634

D.

$19,732

Buy Now
Questions 7

Which species of wood is often used as a substitute for more costly species because of its hardness, grain pattern, and ability to take paint and stain well?

Options:

A.

Poplar

B.

Red oak

C.

Cypress

D.

Redwood

Buy Now
Questions 8

Refer to the exhibit.

What is the purpose of the flexible connection in the fan coil shown?

Options:

A.

To provide a field point of connection of the ductwork to the fan coil unit

B.

To insulate against heat transfer from the fan coil unit

C.

To minimize sound transfer

D.

To transition from the fan coil unit flange to the desired duct size

Buy Now
Questions 9

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner wants to add a small storage closet with dimensions of 4'-0" L x 4'-0" W in the Laundry Room along column line 1. The closet will have access from the corridor only.

Which of the following documents require revision due to this addition? Check the three that apply.

Options:

A.

A101

B.

A102

C.

A103

D.

Building Systems Narrative

E.

Initial Cost Estimate

F.

Specification Excerpts

Buy Now
Questions 10

In a brick veneer wall, what is the primary purpose of the 2-inch air space between the back of the brick and the sheathing?

Options:

A.

To meet the minimum R-value

B.

Allow for differential movement

C.

Provide space for roof drain piping

D.

Minimize mortar bridging

Buy Now
Questions 11

Which document is the most appropriate location for specifying the finish material for casework?

Options:

A.

Construction Drawings

B.

Outline Specifications

C.

Project Manual – Division 06

D.

General Conditions

Buy Now
Questions 12

Which elevator type is the most appropriate choice for a 15-story high-rise residential condominium where speed and noise are considerations?

Options:

A.

Holed hydraulic

B.

Hole-less hydraulic

C.

Geared traction

D.

Gearless traction

Buy Now
Questions 13

Coordination of a motorized movable partition used to subdivide a gymnasium should include which of the following?

Options:

A.

Structural engineer and the electrical engineer

B.

Structural engineer and the mechanical engineer

C.

Fire protection engineer and the electrical engineer

D.

Fire protection engineer and the furniture and equipment consultant

Buy Now
Questions 14

Refer to the exhibit.

In the diagram shown, what is the purpose of the pressure relief valve?

Options:

A.

Regulate water pressure fluctuation

B.

Vent the tank of accumulated air

C.

Allow for thermal expansion of water

D.

Relive negative pressure when draining the tank

Buy Now
Questions 15

Which of the following documents defines the responsibilities and duties of the contractor during construction?

Options:

A.

A101

B.

A201

C.

B101

D.

G702

Buy Now
Questions 16

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

Per the current energy code, the building envelope requirement for walls above grade in this climate zone is R13 + R10c.i.

What specification section must be added to the project?

Options:

A.

Specification Section 072119: Foamed-In-Place Insulation

B.

Specification Section 075419: Polyvinyl-Chloride (PVC)

C.

Specification Section 072100: Thermal Insulation

Buy Now
Questions 17

Which of the following is most appropriate to coordinate ceiling-mounted HVAC diffusers?

Options:

A.

Reflected ceiling plan

B.

Structural framing plan

C.

Floor finish plan

D.

Roof plan

Buy Now
Questions 18

The walls of typical light wood-frame buildings can most economically be made resistive to lateral shear forces, without major alteration to the existing structure, through the use of which one of the following?

Options:

A.

Moment-resistive connections

B.

Plywood sheathing

C.

Exterior board sheathing run horizontally

D.

Wood gusset plates

Buy Now
Questions 19

An architect needs to reduce the budget by $150,000 for a proposed civic auditorium. Currently the project requires the following flooring materials:

    Stained concrete: 100,000 square feet

    Carpet: 50,000 square feet

    Ceramic tile: 20,000 square feet

    Vinyl composite tile (VCT): 25,000 square feet

The flooring material costs are as follows:

    Stained concrete: $6.00/sq ft

    Sealed concrete: $2.00/sq ft

    Carpet: $8.75/sq ft

    Ceramic tile: $15.00/sq ft

    VCT: $5.75/sq ft

    Vinyl plank flooring: $7.00/sq ft

Which of the following combinations of changes results in these savings?

Options:

A.

Change 15,000 sq ft of VCT to vinyl plank flooring and substitute 10,000 sq ft of VCT for carpet.

B.

Change 20,000 sq ft of stained concrete to VCT and substitute 30,000 sq ft of vinyl plank flooring for carpet.

C.

Change 20,000 sq ft of stained concrete to VCT and substitute 10,000 sq ft of VCT for ceramic tile.

D.

Change 25,000 sq ft of stained concrete to sealed concrete and substitute 30,000 sq ft of vinyl plank flooring for carpet.

Buy Now
Questions 20

The building permit plan review for a small, two-story residential project with a crawlspace issues the following comment to the architect:

"No under floor access shown in plans. Please locate and note locations of under floor access."

Site conditions will not allow access to the crawlspace from the exterior.

What drawing will the architect need to update to satisfy the reviewer's comment?

Options:

A.

Second Floor Framing Plan

B.

Main Floor Framing Plan

C.

Foundation Plan

Buy Now
Questions 21

During the documentation of an office building, the owner requests a fitness center amenity be added to the scope. The mechanical engineer informs the architect that the mechanical unit currently located on a utility mezzanine will need to increase in size to accommodate the required increased capacity.

Who should the architect confirm with that the larger unit will work in this location?

Options:

A.

Building owner

B.

Authority having jurisdiction

C.

Accessibility consultant

D.

Structural engineer

Buy Now
Questions 22

Refer to the exhibit.

The construction method shown in the detail should be used to prevent cracking in which of the following situations?

Options:

A.

Structural steel frame buildings with plaster ceilings

B.

Concrete frame buildings with drywall suspended ceilings

C.

Concrete flat slab buildings with exposed slab ceilings

D.

Exposed structural steel frame with no partitions to the structure

Buy Now
Questions 23

For which of the following reasons is sheet piling used? (Check the three that apply)

Options:

A.

A grade beam needs support.

B.

Raked shoring should be created.

C.

A pile cap needs support.

D.

An excessive slope on the sides of the excavation would be required.

E.

The soil surrounding an excavation site will not support itself during or after the digging.

F.

The excavation adjoins a property line and the adjacent property cannot be disturbed.

Buy Now
Questions 24

Refer to the exhibit.

An architect is designing a multipurpose room that will operate daycare services as well as exercise classes. The multiple occupancies within the space utilize components of the same means of egress system.

What is the occupant load factor that should be used in calculating egress?

Options:

A.

20

B.

35

C.

50

D.

150

Buy Now
Questions 25

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner has revised the pro forma and directed the architect to add two additional Type B units to the design. A code review for the project indicates that the building occupancy is R-2.

What should the architect do to meet the owner's required revisions?

Options:

A.

Change the 2nd Floor Unit 1BR-SW into two studios and change the 10th Floor Unit 2BR-E to two 1-bedroom units.

B.

Change the 10th Floor Unit 2BR-E to two 1-bedroom units and change the 7th Floor Unit 2BR-E to two 1-bedroom units.

C.

Change the 5th Floor Unit 2BR-E to two 1-bedroom units and change the 2nd Floor Laundry to a 1-bedroom unit.

Buy Now
Questions 26

Refer to the exhibit.

Which device allows for piping misalignment and isolation?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 27

Refer to the exhibit.

An architect is developing an electrical diagram to show equipment configuration and flow of electricity for a residential project. The project is integrating on-site wind generation where the utility company does not allow net metering.

Which diagram meets the project requirements?

Options:

A.

Diagram A

B.

Diagram B

C.

Diagram C

Buy Now
Questions 28

Refer to the exhibit.

Construction document drawings are in the final review stages. The architect needs to coordinate the casework detail with the probable cost estimate.

Click on the drawing note in the casework section that does not align with the cost estimate.

Options:

Buy Now
Questions 29

In winter conditions, when the outdoor air is below freezing and the indoor humidity is maintained at 40 percent relative humidity for 24 hours a day, ice forms on the exterior surface of the stone facing.

Which of the following elements is missing from the building wall section?

Options:

A.

Vapor barrier

B.

Wall insulation

C.

Air space

D.

Rain screen

Buy Now
Questions 30

Temporary shoring of a masonry wall should remain in place until what point?

Options:

A.

Mortar joints are struck

B.

Lateral bracing connections are complete

C.

Horizontal reinforcing is installed

D.

Foundations are backfilled

Buy Now
Exam Code: PDD
Exam Name: ARE 5.0 Project Development and Documentation Exam
Last Update: Aug 14, 2025
Questions: 100
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now PDD