Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

LEED-AP-O+M Sample Questions Answers

Questions 4

For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?

Options:

A.

Encourage telecommuting and the use of mass transit

B.

Survey visitors to determine their transportation modes

C.

Survey the occupants to determine their transportation modes

D.

Provide parking for low-emitting vehicles for 5% of the building occupants

Buy Now
Questions 5

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

Options:

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Buy Now
Questions 6

Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?

Options:

A.

A workstation with a skylight directly above

B.

An office with windows that are completely covered by inoperable shades

C.

A glass conference room with a view of office plants

D.

An executive office with a view of a park

Buy Now
Questions 7

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

Options:

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Buy Now
Questions 8

What information is required when adding a new space within a facility to the ENERGY STAR® Portfolio Manager?

Options:

A.

Space floor area and hours of operation

B.

Number of workers and lighting power density

C.

Name of utility company and 12 months of energy use data

D.

Statement of energy performance and carbon emissions data

Buy Now
Questions 9

Which of the following is a low impact development (LID) technique for rainwater management?

Options:

A.

Storm inlet

B.

Rain garden

C.

Detention basin

D.

Impervious pavement

Buy Now
Questions 10

How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?

Options:

A.

Local energy supplier estimates or calibrated energy simulation

B.

Historical energy consumption data or calibrated energy simulation

C.

Historical energy consumption data or national average source energy data

D.

Short-term system measurements using data loggers or national average source energy data

Buy Now
Questions 11

Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

Options:

A.

Install VOC sensors

B.

Document all emissions

C.

Use products with low emissions

D.

Comply with ASHRAE 55-2010

Buy Now
Questions 12

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

Options:

A.

50

B.

70

C.

76

D.

85

Buy Now
Questions 13

Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?

Options:

A.

Use of motorcycles

B.

Use of hybrid vehicles

C.

Compressed workweeks

D.

Use of Liquified Petroleum Gas (LPG) vehicles

Buy Now
Questions 14

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

Options:

A.

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Buy Now
Questions 15

A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?

Options:

A.

Provide free coffee and snacks along with the survey

B.

Provide free transit passes for the week before the survey

C.

Pay each survey respondent a cash incentive to encourage them to take public transportation

D.

Email all building occupants asking them to use alternative transportation the week of the LEED survey

Buy Now
Questions 16

Which of the following environmental concerns is exacerbated by impervious surfaces?

Options:

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Buy Now
Questions 17

A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection

Guidance, which rating system would be most applicable for this project?

Options:

A.

LEED Interior Design and Construction: Retail

B.

LEED Operations and Maintenance: Retail

C.

LEED Building Design and Construction: Data Centers

D.

LEED Interior Design and Construction: Commercial Interiors

Buy Now
Questions 18

What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?

Options:

A.

Inspect irrigation systems for leaks once per year

B.

Perform irrigation management tasks manually on a daily basis

C.

Use automated leak detection systems, such as those that use pressure sensors

D.

Correct any deficiencies that are discovered in the irrigation system prior to the performance period

Buy Now
Questions 19

For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?

Options:

A.

Cooling Tower Weekly Meter Readings

B.

Site Management Policy

C.

Alternative Transportation Survey

D.

Occupant Comfort Survey

Buy Now
Questions 20

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

Options:

A.

Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction

B.

Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction

C.

The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction

D.

The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction

Buy Now
Questions 21

The decision to replace Chlorofluorocarbon (CFC) and Hydrochlorofluorocarbon (HCFC) refrigerants with alternative refrigerants

Options:

A.

is straightforward because alternative refrigerants cost less to implement and operate more efficiently

B.

involves tradeoffs because alternative refrigerants are more difficult to manufacture, handle and process

C.

is straightforward because alternative refrigerants such as HFC-410A have a lower Global Warming Potential

(GWP)

D.

involves tradeoffs because alternative refrigerants may increase energy use and increase greenhouse gas emissions

Buy Now
Questions 22

The Materials and Resources (MR) section includes which of the following building products in Credit calculations?

Options:

A.

Furniture

B.

Light Fixtures

C.

Plumbing Fixtures

D.

Mechanical Equipment

Buy Now
Questions 23

An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.

How many occupants should be entered into Portfolio Manager for the vacant office space?

Options:

A.

Zero occupants

B.

100 occupants

C.

150 occupants

D.

200 occupants

Buy Now
Questions 24

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

Options:

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

Buy Now
Questions 25

Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

Options:

A.

The LEED AP

B.

A general contractor

C.

The building engineer

D.

A commissioning (Cx) agent

Buy Now
Questions 26

Buildings account for what percentage of total energy use?

Options:

A.

30%

B.

40%

C.

50%

D.

60%

Buy Now
Questions 27

Instituting a policy to prevent erosion and sedimentation and restore any eroding soils is a requirement of which credit or prerequisite?

Options:

A.

Water Efficiency Prerequiste, Outdoor Water Use Reduction

B.

Sustainable Sites Credit, Rainwater Management

C.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

D.

Sustainable Sites Credit, Site Management

Buy Now
Questions 28

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Buy Now
Questions 29

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Options:

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Buy Now
Questions 30

What requirement must be met when creating a demand response program that satisfies Energy and

Atmosphere Credit, Demand Response?

Options:

A.

Demonstrate a load shift reduction of 5% in the building

B.

Permanently reduce the energy consumption in the building by 5%

C.

Have the building management sign a two-year demand response enrollment

D.

Create a comprehensive plan for meeting the contractual commitment during a demand response event

Buy Now
Questions 31

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Buy Now
Questions 32

According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

Options:

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Buy Now
Questions 33

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

Options:

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

Buy Now
Questions 34

The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the

Options:

A.

Kyoto Protocol while minimizing direct contributions to climate change

B.

Montreal Protocol while minimizing direct contributions to climate change

C.

Kyoto Protocol while minimizing direct and indirect contributions to climate change

D.

Montreal Protocol while minimizing direct and indirect contributions to climate change

Buy Now
Questions 35

Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

Options:

A.

Retain a LEED AP

B.

Perform a full life-cycle assessment

C.

Bring the project team together in the performance phase

D.

Take an integrative approach

Buy Now
Questions 36

What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?

Calculator

Options:

A.

1 point

B.

2 points

C.

3 points

D.

4 points

Buy Now
Questions 37

A management method that could be included in a project's site management policy is the use of

Options:

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Buy Now
Questions 38

Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)

Options:

A.

All of the five parameters summed together

B.

All of the five parameters subtracted from the maximum concentration level

C.

Whichever of the five parameters has the fewest calculated cycles of concentration without exceeding the maximum level for the parameter

D.

Whichever of the five parameters has the greatest calculated cycles of concentration without exceeding the maximum level for the parameter

Buy Now
Questions 39

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Buy Now
Questions 40

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

Options:

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade

Buy Now
Questions 41

The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

Options:

A.

one point

B.

two points

C.

three points

D.

four points

Buy Now
Questions 42

Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?

Options:

A.

Refrigerators

B.

Replacement carpet tiles

C.

Janitorial paper purchases

D.

Automated scrubbing machines

Buy Now
Questions 43

One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must

Options:

A.

estimate the purchases of the other tenants and assume they are compliant in the Materials and Resources credit calculations

B.

estimate the purchases of the other tenants and assume they are noncompliant in the Materials and Resources credit calculations

C.

estimate the purchases of the other tenants and apply the compliance rate from LEED applicant in the Materials and Resources credit calculations

D.

exclude the purchases of the other tenants from the Materials and Resources credit calculations

Buy Now
Questions 44

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement

Plan?

Options:

A.

Soils

B.

Hydrology

C.

Vegetation

D.

Maintenance equipment

Buy Now
Questions 45

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

Options:

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Buy Now
Questions 46

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

Options:

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Buy Now
Questions 47

Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards

compliance for what category of building space?

Options:

A.

Exterior

B.

Lavatory

C.

Mechanical

D.

Individual occupant

Buy Now
Questions 48

For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?

Options:

A.

Those that represent at least 10% of the total annual consumption of the building minus plug load use

B.

Those that represent at least 15% of the total annual consumption of the building minus plug load use

C.

Those that represent at least 20% of the total annual consumption of the building minus plug load use

D.

Those that represent at least 25% of the total annual consumption of the building minus plug load use

Buy Now
Questions 49

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Buy Now
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: May 7, 2024
Questions: 166
$64  $159.99
$48  $119.99
$40  $99.99
buy now LEED-AP-O+M