Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

LEED-AP-ID+C Sample Questions Answers

Questions 4

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.

10%

B.

15%

C.

20%

D.

25%

Buy Now
Questions 5

The project material costs for Building Product Disclosure and Optimization cost-based credits are

Options:

A.

actual costs, furniture included

B.

default costs, 30% of total construction cost

C.

actual costs, furniture optional

D.

default costs, 40% of total construction cost

Buy Now
Questions 6

The use of MERV 13 (F7) air filters is required to obtain what credit?

Options:

A.

Energy and Atmosphere Credit, Advanced Energy Metering

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

D.

Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan

Buy Now
Questions 7

Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

75% Rainforest Alliance Certified flooring with a total cost of $3,000 USD

B.

10% Rainforest Alliance Certified furniture with a total cost of $30,000 USD

C.

50% Rainforest Alliance Certified wood veneer with a total cost of $5,000 USD

D.

100% Rainforest Alliance Certified wheatboard with a total cost of $2,000 USD

Buy Now
Questions 8

Which sentence is true about Renewable Energy Certificates (RECs)?

Options:

A.

RECs can be used to mitigate the effects of all scope two emissions.

B.

RECs can be used toward both electric and nonelectric energy use.

C.

RECs can be used to mitigate emissions from purchased electricity.

D.

RECs can be used to mitigate emissions from electricity produced on site.

Buy Now
Questions 9

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

Options:

A.

Choosing energy efficient systems

B.

Conducting a simple box energy model

C.

Implementing passive design strategies

D.

Performing commissioning of energy systems

Buy Now
Questions 10

What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Demolition waste

B.

Plumbing fixtures

C.

Salvaged furniture

D.

Existing building conditions

Buy Now
Questions 11

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.

Minimum number of parking spaces required by the local zoning code

B.

Maximum dimensions for on-street parking spaces allowed by the local zoning code

C.

Minimum number of electric vehicle charging spaces required by the local zoning code

D.

Maximum number of levels in structured parking garages allowed by the local zoning code

Buy Now
Questions 12

Which standard reference can be used to find minimum ventilation rates?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2010

C.

SCAQMD Rule 1168

D.

ASHRAE 62.1-2010

Buy Now
Questions 13

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

Options:

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Buy Now
Questions 14

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Up to three layers of a floor assembly

B.

Items that are demolished and not replaced

C.

The interior side of exterior windows and doors

D.

Hazardous materials that are remediated as part of the project

Buy Now
Questions 15

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

Options:

A.

Included in the numerator only

B.

Included in the denominator only

C.

Included in both the numerator and denominator

D.

Excluded from both the numerator and denominator

Buy Now
Questions 16

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

Options:

A.

Waste stream, total waste, diverted waste, waste to landfill

B.

Waste volume, commingled waste, wood for energy, reused items

C.

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

Buy Now
Questions 17

A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning. Who may be appointed as the Commissioning Authority (CxA) for the project?

Options:

A.

An employee of the architecture or engineering firm but not a member of the design team

B.

A sub-consultant to the architecture or engineering firm but not a member of the design team

C.

A subcontractor of the general contractor or construction manager but not a member of the construction team

D.

An employee or subcontractor of the general contractor or construction manager and a member of the construction team

Buy Now
Questions 18

For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?

Options:

A.

The project administrator

B.

A LEED AP without specialty

C.

The LEED AP with any specialty

D.

The LEED AP with ID+C specialty

Buy Now
Questions 19

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Questions 20

A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?

Options:

A.

Regional Priority Credit, Optimize Energy Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Buy Now
Questions 21

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Buy Now
Questions 22

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

Options:

A.

10%

B.

20%

C.

30%

D.

50%

Buy Now
Questions 23

Which of the following fixtures requires a WaterSense label (or local equivalent for projects outside the US)?

Options:

A.

A tankless toilet

B.

A waterless urinal

C.

An existing showerhead

D.

A private lavatory faucet

Buy Now
Questions 24

For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?

Options:

A.

Copy rooms

B.

Break rooms

C.

Conference rooms

D.

Office building lobbies

Buy Now
Questions 25

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design

C.

developing the LEED Scorecard

D.

implementing the Commissioning Plan

Buy Now
Questions 26

The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?

Options:

A.

Increase the rainwater infiltration capacity

B.

Decrease the amount of bicycle parking that must be provided

C.

Increase the overall SR (solar reflectance) of the hardscape area

D.

Decrease the required amount of on-street parking that must be provided

Buy Now
Questions 27

A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)

Options:

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

C.

Indoor Environmental Quality Credit, Indoor Air Quality Assessment

D.

Energy and Atmosphere Credit, Advance Energy Metering

Buy Now
Questions 28

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

Options:

A.

owner

B.

architect

C.

contractor

D.

project manager

Buy Now
Questions 29

A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?

Options:

A.

Unattempt the credit

B.

Submit documentation as is

C.

Request that the room be repainted with compliant paint

D.

Obtain current certifications for the wall and ceiling paints

Buy Now
Questions 30

Which strategy could be incorporated into the negotiations of a lease agreement between a tenant and building owner

to contribute towards earning a LEED credit?

Options:

A.

A lease renewal option prior to 10 years

B.

Discounted parking fees for first year of lease

C.

An energy payment plan where the tenant pays a flat rate on utilities through the building owner

D.

Energy purchase through the building owner's campus facility that produces renewable power to Green-e standards

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: May 7, 2024
Questions: 100
$64  $159.99
$48  $119.99
$40  $99.99
buy now LEED-AP-ID+C