Summer Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

CTFL4 Sample Questions Answers

Questions 4

What type of testing measures its effectiveness by tracking which lines of code were executed by the tests?

Options:

A.

Acceptance testing

B.

Structural testing

C.

Integration testing

D.

Exploratory testing

Buy Now
Questions 5

For the same financial institution in Question 12, with the same requirements and expectations, what would be the most likely investment values used in testing if two-point boundary value analysis is used to design test cases specific to the 13% interest rate equivalence partition?

Options:

A.

R100 000, R100 001, R500 000, R500 001.

B.

R99 999, R100 000, R499 999, R500 000.

C.

R100 000. R500 000.

D.

R99 000, R500 001.

Buy Now
Questions 6

Consider the following table, which contains information about test cases from the test management system:

Which ONE of the following optionsorganizes the test cases based on the statement coverage strategy, while considering practical constraints?

Options:

A.

{TC 20; TC 30; TC 10; TC 40; TC 50; TC 70; TC 60; TC 80; TC 90}

B.

{TC 10; TC 30; TC 20; TC 60; TC 40; TC 80; TC 90; TC 50; TC 70}

C.

{TC 80; TC 70; TC 50; TC 60; TC 20; TC 30; TC 10; TC 40; TC 90}

D.

{TC 60; TC 80; TC 40; TC 90; TC 50; TC 10; TC 70; TC 30; TC 20}

Buy Now
Questions 7

Which ONE of the following options CORRECTLY describes one of the seven principles of the testing process?

Options:

A.

The objective of testing is to implement exhaustive testing and execute as many test cases as possible.

B.

Exhaustive testing can only be carried out using behavior-based techniques.

C.

It is impossible to test all possible combinations of inputs and preconditions of a system.

D.

Automated testing enables exhaustive testing.

Buy Now
Questions 8

Which of the following best describes the relationship between a test progress report and a test summary report?

Options:

A.

The test report prepared during a test activity may be referred to as a test progress report, while a test report prepared at the end of a test activity may be referred to as a test summary report.

B.

The test report prepared during a test activity may be referred to as a test summary report, while a test report prepared at the end of a test activity may be referred to as a test progress report.

C.

There is no difference between a test progress report and a test summary report.

D.

Both the test progress report and the test summary report should always be generated via an automated tool.

Buy Now
Questions 9

An alphanumeric password must be between 4 and 7 characters long and must contain at least one numeric character, one capital (uppercase) letter and one lowercase letter of the alphabet.

Which one of the following sets of test cases represents the correct outcome of a two-value boundary value analysis applied to the password length? (Note: test cases are separated by a semicolon)

Options:

A.

1xA;aB11;Pq1ZZab;7iDD0a1x

B.

aB11;99rSp:5NnN10;7iDD0a1x

C.

1xB: aB11: 99rSp: 5NnN10; 4NnN10T; 44ghWn19

D.

1RhT;rSp53;3N3e10;8sBdby

Buy Now
Questions 10

Which ONE of the following options corresponds to an activity in the testing process in which testable features are identified?

Options:

A.

Test design

B.

Test analysis

C.

Test implementation

D.

Test execution

Buy Now
Questions 11

Which ONE of the following options isNOTa benefit oftest automation?

Options:

A.

Reduced test execution times

B.

More objective assessment

C.

Prevention of simple human errors

D.

Eliminating completely the need for manual testing

Buy Now
Questions 12

In Agile teams, testers closely collaborate with all other team members. This close collaboration could be problematic and result in testing-related organizational risks.

Which TWO of the following organization risks could be encountered?

I.Testers lose motivation and fail at their core tasks.

ii.Close interaction with developers causes a loss of the appropriate tester mindset.

iii.Testers are not able to keep pace with incoming changes in time-constrained iterations.

iv.Testers, once they have acquired technical development or business skills, leave the testing team.

Options:

A.

ii and iii

B.

i and iii

C.

i and ii

D.

ii and iv

Buy Now
Questions 13

Given the following User Story: "As an online customer, I would like to be able to cancel the purchase of an individual item from a shopping list so that it only displays the relevant items, in less than 1 second", which of the following can be considered as applicable acceptance test cases?

I.Click on my online shopping list, select the unwanted Item, delete the unwanted item, the unwanted Item is deleted from the shopping list in less than 1 second.

ii.Click on my online shopping list, select all the items, delete all the items, the unwanted items are deleted from the shopping list in less than 1 second.

iii.Tab to the online shopping list and press enter, select the unwanted item, delete the unwanted item, the unwanted item is deleted from the shopping list In less than 1 second.

Iv. Click on the checkout button, select the payment method, make payment, confirmation received of payment and shipping date.

v. Click on my shopping list, select the unwanted Item, delete the unwanted item, the unwanted item is deleted from the shopping list.

Select the correct answer:

Options:

A.

I, ii and v

B.

iv

C.

i and iii

D.

v

Buy Now
Questions 14

Exploratory testing is an experience-based test technique

Options:

A.

Where a developer and a tester work together on the same workstation while the developer actively writes code, the tester explores the code to find defects.

B.

That can be organised into sessions guided by test charters outlining test objectives that will guide the testers' exploration

C.

Where a team of testers explores all possible test techniques in order to determine the most suitable combination of these techniques to apply for a test project.

D.

That aims at finding defects by designing tests that exercise all possible combinations of input values and preconditions

Buy Now
Questions 15

Which of the following statements is not correct?

Options:

A.

Looking for defects in a system may require Ignoring system details

B.

Identifying defects may be perceived as criticism against product

C.

Looking for defects in system requires professional pessimism and curiosity

D.

Testing is often seen as a destructive activity instead of constructive activity

Buy Now
Questions 16

The fact that defects are usually not evenly distributed among the various modules that make up a software application, but rather their distribution tend to reflect the Pareto principle:

Options:

A.

is a false myth

B.

is expressed by the testing principle referred to as Tests wear out'

C.

is expressed by the testing principle referred to as 'Defects cluster together'

D.

is expressed by the testing principle referred to as 'Bug prediction'

Buy Now
Questions 17

Determining the schedule for each testing activity and test milestones for a test project, using activity estimates, available resources, and other constraints is a typical task performed during

Options:

A.

Test execution

B.

Test design.

C.

Test analysis.

D.

Test planning

Buy Now
Questions 18

Testing Quadrants, as a model, is effective in aligning stakeholders within Agile teams.

Which of the following examples demonstrates this?

Options:

A.

Using Testing Quadrants, the test manager is able to measure and communicate test coverage to all stakeholders.

B.

Using Testing Quadrants, the test manager is able to communicate potential product risk to all stakeholders.

C.

Using Testing Quadrant, the test manager is able to prioritize defects by linking these to a specific type of test.

D.

Using Testing Quadrants, the test manager is able to differentiate and describe the types of tests to all stakeholders.

Buy Now
Questions 19

During component testing of a program if 100% decision coverage is achieved, which of the following coverage criteria is also guaranteed to be 100%?

Options:

A.

100% Stale transition coverage

B.

100% Equivalence class coverage

C.

100% Boundary value coverage

D.

100% Statement coverage

Buy Now
Questions 20

A calculator software is used to calculate the result for 5+6.

The user noticed that the result given is 6.

This is an example of;

Options:

A.

Mistake

B.

Fault

C.

Error

D.

Failure

Buy Now
Questions 21

The tests at the bottom layer of the test pyramid:

Options:

A.

run faster than the tests at the top layer of the pyramid

B.

cover larger pieces of functionalities than the tests at the top layer of the pyramid

C.

are defined as 'Ul Tests' or 'End-To-End tests' in the different models of the pyramid

D.

are unscripted tests produced by experience-based test techniques

Buy Now
Questions 22

Which ONE of the following options BEST describes the purpose of confirmation testing versus regression testing?

Options:

A.

The purpose of confirmation testing is to confirm that the defect giving rise to a failure has been successfully fixed. The regression test aims to ensure that no defects have been introduced ordiscovered in unmodified areas of the software as a result of the changes made.

B.

Confirmation testing ensures the entire system functions as expected, whereas regression testing focuses only on modified components.

C.

Confirmation testing verifies all system requirements, while regression testing ensures that no additional test cases are needed.

D.

Regression testing and confirmation testing are interchangeable and serve the same purpose.

Buy Now
Questions 23

The following state transition diagram describes the functionality involved in a system using fingerprint and password authentication to log onto a system.

How many distinct states of the system are visible in the above diagram?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 24

What is test oracle?

Options:

A.

The source of lest objectives

B.

The source for the actual results

C.

The source of expected results

D.

The source of input conditions

Buy Now
Questions 25

The following chart represents metrics related to testing of a project that was competed. Indicate what is represented by tie lines A, B and the axes X.Y

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 26

Consider an estimation session in which a six-member Agile team (Memb1..... Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1,2, 3,5, 8,13,21. Below is the outcome of the first round of estimation for this session:

Which of the following answers BEST describes how the estimation session should proceed?

Options:

A.

The final estimate of the user story in story points is determined by applying the three-point estimation technique with the following input values most optimistic estimate - 1, most likely estimate - 3, and most pessimistic estimate - 21

B.

Further estimation rounds should be performed until all team members will pick the card having the same value: this value will represent the final estimate of the user story in story points.

C.

The final estimate of the user story in story points is determined by calculating the average value between the most optimistic estimate of 21 story points (Memb4> and the most pessimistic estimate of 1 story point (Memb6)

D.

Memb6 and Memb4 which have produced the most pessimistic and the most optimistic estimates respectively, should explain the reasons of their choices to stimulate a discussion between all members before proceeding to another estimation round

Buy Now
Questions 27

Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.

Which of the following review types does this review refer to?

Options:

A.

Inspection

B.

Audit

C.

Walkthrough

D.

Informal review

Buy Now
Questions 28

A typical objective of testing is to ensure that:

Options:

A.

testing is used to drive the development of a software

B.

a software has been tested using a combination of test techniques

C.

there are no defects in a software that is about to be released

D.

a software has been properly covered

Buy Now
Questions 29

Which sequence of stated in the answer choices is correct in accordance with the following figure depicting the life-cycle of a defect?

Options:

A.

S0->S1->S2->S3->S5->S1

B.

S0->S1->S2->S3->S5->S1->S2->S3

C.

S0->S1->S2~>S3->S4

D.

S0->S1 ->S2->S3->S5->S3->S4

Buy Now
Questions 30

You are testing the latest version of an air-traffic control system prior to production deployment using exploratory testing. After following an unusual sequence of input steps, the system crashes. After the crash, you document a defect report with the following information:

•Title: System crashes unexpectedly during input.

•Brief summary: System crashes when an unusual sequence of inputs is used.

•Version: V1.001

•Test: Exploratory testing prior to production deployment

•Priority: Urgent

•Risk: High

•References: Screenshot of crashed application

What critical Information Is missing from this report?

Options:

A.

Conclusions, recommendations, and approvals.

B.

Change history.

C.

Description of the defect to enable reproduction.

D.

Status of defect

Buy Now
Questions 31

As a result of the joint evaluation of a product version with the customer, it has been concluded that it would be appropriate to retrieve an earlier version of the product and carry out a benchmark. Depending on the result, further development will be carried out based on the current version or the retrieved version.

Which mechanism, process, and/or technique will allow the specific version (including the testing work products) of a given software product to be restored?

Options:

A.

Defect management

B.

Configuration management

C.

Change management

D.

Risk management

Buy Now
Questions 32

Consider the followingiteration planning taskswhere a tester can provide value:

    Break down user stories into tasks (particularly testing tasks)

    Estimate test effort for all testing tasks

    Identify and refine functional and non-functional aspects of the test object

Which ONE of the following tasks should be ADDED to the above list?

Options:

A.

Determining the test strategy

B.

Participating in the detailed risk analysis of user stories and determining their testability

C.

Planning the testing for the release

D.

Writing testable user stories and acceptance criteria

Buy Now
Questions 33

A test manager decided to skip static testing since he believes bugs can be found easily by doing dynamic testing. Was this decision right or wrong?

Options:

A.

The decision was wrong. Ensuring quality mandates that static testing is performed after performing the dynamic testing.

B.

The decision was right. Static testing is usually redundant if a product is planned to go through a full-cycle of dynamic testing.

C.

The decision was right. Most of the bugs are easier to identify during the dynamic testing.

D.

The decision was wrong. Static testing can find defects early in the development process, reducing the overall cost of testing and development

Buy Now
Questions 34

Which of the following statements about white-box testing is FALSE?

Options:

A.

Static testing can benefit from using code-related white-box test techniques during code reviews.

B.

White-box testing allows suggesting test cases for increasing coverage levels which are based on objective measures

C.

Achieving full code coverage for a component or a system ensures that it has been fully tested

D.

Black-box testing can benefit from using code-related white-box test techniques to increase confidence in the code.

Buy Now
Questions 35

The whole-team approach:

Options:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

Buy Now
Questions 36

A document descnbes the test procedures that have been derived for the identified test sets Among other things, the order in which the test cases in the corresponding test set are to be executed according to the dependencies described by preconditions and postconditions is specified This document is a typical work product produced as part of:

Options:

A.

Test design.

B.

Test analysis

C.

Test Implementation.

D.

Test monitoring and control

Buy Now
Questions 37

The statement: "Test activities should start in the early stages of the lifecycle, adhering to the testing principle of early testing” is relevant to which of the recognized software development models?

Options:

A.

Sequential development model.

B.

Iterative development model.

C.

Incremental development model.

D.

All the above

Buy Now
Questions 38

Which of the following statements is TRUE'?

Options:

A.

Unlike functional testing, non-fundional testing can only be applied to conventional systems, not artificial intelligence-based system.

B.

Functional testing focuses on what the system is supposed to do, while white-box testing focuses on how well the system does what it is supposed to do

C.

Functional testing can be applied to all test levels, while non-functional testing can be applied only to system and acceptance test levels.

D.

Black-box test techniques and experience-based test techniques may be applicable to both functional testing and non-functional testing

Buy Now
Questions 39

Which ONE of the following options MOST ACCURATELY describesbranch testing?

Options:

A.

In branch testing, the coverage items are executable statements. The aim is to design test cases that exercise statements in the code until an acceptable level of coverage is achieved, expressed as a percentage.

B.

In branch testing, the coverage items are control flow transfers between decisions, and the aim is to design test cases to exercise flow transfers in the code until an acceptable level of coverage is achieved. Coverage is measured as the number of branches exercised by the test cases divided by the total number of branches expressed as a percentage.

C.

In branch testing, the coverage items are branches, and the aim is to design test cases to exercise branches in the code until an acceptable level of coverage is achieved. Coverage is measured as the number of branches exercised by the test cases divided by the total number of branches expressed as a percentage.

D.

In branch testing, the coverage items are executable decisions. The aim is to design test cases that exercise statements in the code until an acceptable level of coverage is achieved. Coverage is expressed as a percentage.

Buy Now
Questions 40

Which ONE of the following options is aPRODUCT riskand NOT aPROJECT risk?

Options:

A.

Incorrect calculation logic in the software, leading to inaccurate results.

B.

Poor communication between team members, making project management more difficult.

C.

Staff shortages in the project leading to scheduling problems.

D.

Delays in the delivery of work products by the project team.

Buy Now
Questions 41

Which of the following statements about the test pyramid is TRUE?

Options:

A.

Each layer of the test pyramid groups tests related to a single non-functional quality charactenstic.

B.

The higher the layer of the test pyramid, the more production code a single automated test within the layer tends to cover

C.

The higher the layer of the test pyramid, the more maintainable a single automated test within the layer tends to be

D.

The higher the layer of the test pyramid, the more isolated a single automated test within the layer tends to be.

Buy Now
Questions 42

During iteration planning, a scrum team uses an estimation technique called planning poker to estimate the effort required to deliver a critical user story. In advance of the estimation session, the team agreed on some ground rules to limit the number of poker rounds and save time.

The team agreed on the following:

1. They will use the following progression for estimation: Extra-small, Small, Medium, Large, Extra-large, and Extra-extra-large.

2. If estimation values differ significantly, the highest score will be used for estimation purposes.

The result of the first round of planning poker:

Team MemberEstimation

BusinessLarge

DevelopmentExtra-extra-large

TestingExtra-extra-large

Which of the following options best represent the team’s next actions?

Options:

A.

The fact that all estimations are high indicate that the user story is not well understood or should be broken down into multiple smaller stories.

B.

The pre-agreed rules state that the highest score should be used for estimation, resulting in the user story being categorised as Extra-extra-large.

C.

Since the business representative is likely to have the most informed view of the requirement, the user story is categorised as a Large.

D.

the team discusses the differences in the estimates and repeats the poker round until an agreemet is reached.

Buy Now
Questions 43

The following diagram displays the logical dependencies between requirements and the individual requirement priorities. For example, "R2->R3" means that R3 is dependent on R2. Priority is indicated by the number next to the letter ”P" i.e. P1 has a higher priority than P2.

Which one of the following options best describes the test execution sequence using both requirement dependency and priority

Options:

A.

R2. R1, R3. R4. R5, R6. R7, R8.

B.

R1, R2, R3, R4, R5, R6, R7, R8.

C.

R2, R4. R8, R5, R1, R6, R3, R7.

D.

. R2, R1,R3,R7,R6,R5,R4,R8.

Buy Now
Questions 44

Your organization's test strategy states that it is desirable to usemore than one method for estimating test effort. You are responsible for estimating test effort for the next project. Based on historical data, thedevelopment-to-test effort ratiois5:3.

The initial estimate for thedevelopment effort is 450 person-days.

Which ONE of the following options corresponds to the estimatedtest effortusing the ratio-based method?

Options:

A.

750 person-days

B.

180 person-days

C.

720 person-days

D.

270 person-days

Buy Now
Questions 45

In a two-hour uninterrupted test session, performed as part of an iteration on an Agile project, a heuristic checklist was used to help the tester focus on some specific usability issues of a web application.

The unscripted tests produced by the tester's experience during such session belong to which one of the following testing quadrants?

Options:

A.

Q1

B.

Q2

C.

Q3

D.

Q4

Buy Now
Questions 46

Test automation allows you to:

Options:

A.

demonstrate the absence of defects

B.

produce tests that are less subject to human errors

C.

avoid performing exploratory testing

D.

increase test process efficiency by facilitating management of defects

Buy Now
Questions 47

From a testing perspective, configuration management

Options:

A.

Allows the expected results to be compared with the actual results.

B.

Allows the tracking of all changes to versions of the testware.

C.

Includes all activities that direct and control an organisation with regard to quality

D.

Focuses on configuring static analysis tools to choose the most suitable breadth and depth of analysis.

Buy Now
Questions 48

Which one of the following statements relating to the benefits of static testing is NOT correct?

Options:

A.

Static testing enables early detection of defects before dynamic testing is performed.

B.

Static testing reduces testing costs and time.

C.

Static testing increases development costs and time.

D.

Static testing identifies defects which are not easily found by dynamic testing.

Buy Now
Questions 49

Consider the following user story about the authentication functionality of an e-commerce website:

"As a logged-in user, I want to change my current password with a new one, so that I can make my account safer".

The following are some of the acceptance criteria defined for the user story:

[a] After the logged-in user has successfully changed his password, an email confirming the change must be sent to him

[b] To successfully change the password, the logged-in user must enter the current password, enter a new valid password, and finally confirm by pressing the 'Change Password' button

[c] To be valid, the new password entered by the logged-in user is not only required to meet the criteria related to the length and type of characters, but must also be different form the last 5 passwords of that user

[d] A dedicated error message must be presented to the logged-in user when he enters a wrong current password

[e] A dedicated error message must be presented to the logged-in user when he enters the correct current password, but enters an invalid password

Based only on the given information, which of the following ATDD tests is most likely to be written first?

Options:

A.

The logged-in user enters a wrong current password and views the dedicated error message

B.

The logged-in user enters the correct current password, enters a valid new password (different from the last 5 passwords), presses the Change Password' button, and finally receives the e-mail confirming that the password has been successfully changed

C.

The logged-in user enters the correct current password, enters an invalid password, and finally views the dedicated error

D.

The logged-in user submits a purchase order containing ten items, selects to pay with a Visa credit card, enters credit card information of a valid card, presses the 'Confirm' button, and finally views the dedicated message confirming that the purchase has been successful

Buy Now
Questions 50

A software company decides to invest in reviews of various types. The thought process they have is that each artifact needs to be reviewed using only one of the review methods depending on the criticality of the artifact.

Options:

A.

The thought process is incorrect. The whole company should adopt same standard for review of all artifacts.

B.

The thought process is correct. The whole company should decide or the review method based on their CMM level.

C.

The thought process is incorrect. Same artifact can be reviewed using different review methods

D.

The thought process is correct. It wastes time to review same artifact using efferent review methods

Buy Now
Questions 51

A requirement specifies that a certain identifier (ID) must be between 5 and 10 characters long, must contain only alphanumenc characters, and its first character must be a letter As a tester, you want to apply one-dimensional equivalence partitioning to test this ID. This means that you have to apply equivalence partitioning individually: to the length of the ID, the type of characters contained within the ID, and the type of the first character of the ID. What is the number of partitions to cover?

Options:

A.

7.

B.

6.

C.

5.

D.

3.

Buy Now
Questions 52

Which of the following work products cannot be examined by static analysis?

Options:

A.

Test plans

B.

Source code

C.

Compiled code

D.

Formal models

Buy Now
Questions 53

Which two of the following statements describe the advantages provided by good traceability between the test basis and test work products?

I. Analyzing the impact of changes.

ii. A measure of code quality.

iii. Accurate test estimation.

iv. Making testing auditable.

Select the correct answer:

Options:

A.

i and ii

B.

i and iv

C.

i and iii

D.

ii and iii

Buy Now
Questions 54

Which of the statements correctly describes when a whole team approach may NOT be suitable?

Options:

A.

When a high level of test independence may be required.

B.

When acceptance tests need to be created.

C.

When a test automation approach needs to be determined.

D.

When the team dynamics need to be improved.

Buy Now
Questions 55

Consider the following list of possible benefits of retrospectives (A to D):

Options:

A.

Team bonding and learning

B.

Increased test effectiveness/efficiency

C.

Improved quality of the test basis

D.

Better cooperation between development and testing

... and the list of possible characteristics of retrospectives (1 to 4) that enable achieving these benefits:

The possibility of implementing suggestions for process improvement

The opportunity to raise problems and propose points for improvement

The regular review and optimization of the collaboration between team members

The possibility of addressing and solv

E.

A1 - B4 - C3 - D2

F.

A2 - B1 - C4 - D3

G.

A4 - B3 - C2 - D1

Buy Now
Questions 56

Confirmation testing is performed after:

Options:

A.

a defect is fixed and after other tests do not find any side-effect introduced in the software as a result of such fix

B.

a failed test, and aims to run that test again to confirm that the same behavior still occurs and thus appears to be reproducible

C.

the execution of an automated regression test suite to confirm the absence of false positives in the test results

D.

a defect is fixed, and if such testing is successful then the regression tests that are relevant for such fix can be executed

Buy Now
Exam Code: CTFL4
Exam Name: ISTQB Certified Tester Foundation Level CTFL 4.0 Exam
Last Update: Jul 9, 2025
Questions: 188
$66  $164.99
$50  $124.99
$42  $104.99
buy now CTFL4