Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

HPE6-A69 Sample Questions Answers

Questions 4

Match the BGP path selection criteria attributes (Each option may be used once, more than once, or not at all)

Options:

Buy Now
Questions 5

An administrator warns to create an ACL.

Permit traffic from 192.168.10, 65 through 192.168.10.94

Permit traffic from 192 168 10 104 through 192 16810.119

deny all other ip traffic

Which configuration is required to accomplish the administrator’s goals?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 6

When planning a new wired network solution for an organization, mere are technical goals that must be achieved to support the organization objectives and their applications and services.

Which options are valid technical goals? (Select two.)

Options:

A.

Reduce the cost of wiring.

B.

Transform the process of acquisition of a new network solution from a CAPEX to an OPEX model

C.

improve the network throughput

D.

Replace hardware that is reaching end of support with a technology refresh.

E.

Accelerate the ordering process of new network hardware.

Buy Now
Questions 7

You need to establish a baseline summary of an ArubaOS-CX switch resource utilization after enabling new NAE scripts. How should you define a baseline for switch resource consumption? (Select two.)

Options:

A.

show system cpu

B.

top memory

C.

show system memory

D.

top cpu

Buy Now
Questions 8

With the given topology, the customer Has ArubaOS-CX 6300 switches and Aruba Gateway in use.

What is required for the client traffic to be tunneled as per best practice between the connected switch port and the Aruba Gateway'' (Select two.)

Options:

A.

IP Protocol 6 should not be blocked on me datapath

B.

IP Protocol 47 should not be blocked in the data-path

C.

The ArubaOS-CX switch and Aruba gateway should have an end-to-end MacSec connection

D.

The ArubaOS-CX switch and Aruba gateway should be EBGP peers.

E.

Change the default MTU on the data-path between the switch and gateway

Buy Now
Questions 9

Refer to the exhibit.

Aruba CX 6300 switch has routes in three different VRFs as per the example above. The user needs to leak routes between VRF Secure and VRF Dev. and also between VRF default and VRF Dev

The customer Is not able to establish routing between directly connected networks 10.100.50.0/24 and 10.102.26.0/24 Which statement is true regarding the routing troubleshooting?

Options:

A.

Multi-protocol BGP routing needs to be defined for route leaking

B.

Route Distinguisher needs to be set to 1 for default VRF.

C.

Route leaking is supported between non-default VRFs only

D.

Route leaking between default and non-default VRFs is supported with Aruba CX 8400.

Buy Now
Exam Code: HPE6-A69
Exam Name: Aruba Certified Switching Expert Written Exam
Last Update: Apr 26, 2024
Questions: 60
$64  $159.99
$48  $119.99
$40  $99.99
buy now HPE6-A69