Weekend Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65percent

Welcome To DumpsPedia

Construction-Manager Sample Questions Answers

Questions 4

As the owner’s representative, you are providing on-site construction management services to a municipality for their new design-build city hall project.

The mechanical subcontractor discovers that his ductwork will not fit in the above-ceiling area of the Mayor’s office. Which entity is best-suited to resolve this risk?

Options:

A.

Owner (Municipality)

B.

Architect (DOR)

C.

Owner’s rep

D.

Design-Build Team

Buy Now
Questions 5

When applying Business Intelligence (also known as data mining) to manage large volumes of construction project data, the source data must

Options:

A.

first exist in hard copy format.

B.

include advanced algorithms.

C.

first exist in digital format.

D.

include outliers and missing data.

Buy Now
Questions 6

When developing schedule specifications, which of the following practices should the CM recommend to the Owner to avoid disputes regarding weatherdelays per year?

Options:

A.

Using a recognized reference such as NOAA. define the number of allowable "normal" weather impact days expected to occur on the project within the contract documents.

B.

Ask the contractor to specify the number of weather days they believe necessary for the project.

C.

Defer all issues related to weather to NOAA.

D.

Consult a local meteorologist to determine the best estimate of the number of weather days to allow on the project.

Buy Now
Questions 7

In what decade was the new occupation of "construction manager" created to fulfill an identified need?

Options:

A.

1930s

B.

1950s

C.

1980s

D.

1970s

Buy Now
Questions 8

At what stage of the design phase shall the CM conduct a constructability review?

Options:

A.

90% design stage

B.

60% design stage

C.

Throughout the design process including 100% design documents

D.

30% design stage

Buy Now
Questions 9

A CM's responsibility for safety on the jobsite includes

Options:

A.

no obligation for safety as it is the contractor's responsibility.

B.

a professional obligation shared with others.

C.

certifying subcontractor compliance.

D.

drafting the contractor's safety plan.

Buy Now
Questions 10

A program management function that promotes the efficient use of completed projects and/or parts of completed projects to maximize the owner's return on investment is called

Options:

A.

resource-leveling.

B.

contract packaging.

C.

project phasing.

D.

project financing.

Buy Now
Questions 11

Lifecycle analysis of a project will provide the greatest impact during which of the following phases?

Options:

A.

Pre-Design

B.

Design

C.

Construction

D.

Procurement

Buy Now
Questions 12

Contract administration includes, but is not limited to, planning for implementation of drawings, specifications, and

Options:

A.

standards.

B.

owner's scope of work.

C.

permits.

D.

licenses.

Buy Now
Questions 13

As the owner's rep, you are providing on-site construction management services to a municipality for their new design-build city mall project.

During your review of the design-build team's schedule update, you discover the project is five weeks behind schedule. What is your recommendation to the owner regarding the document needed from the design-build team to correct the situation?

Options:

A.

Recovery plan

B.

Baseline schedule

C.

Short interval schedule

D.

Contract modification

Buy Now
Questions 14

= P × [(C + T + Q) + 3]

P is Probability

C is Cost

T is Time

Q is Quality

This equation best describes a(n)

Options:

A.

overall risk score.

B.

cost time quality evaluation.

C.

risk variable score.

D.

Monte Carlo simulation equation.

Buy Now
Questions 15

Owner's representation staff are managing the construction of a new water treatment plant. The owner has specific operational and sustainability goals they want met and are contracting the team for full commissioning services. The commissioning plan should include which of the following requirements for each party in the commissioning process?

Options:

A.

Sequencing, scheduling, design review, verification procedures

B.

Sequencing, scheduling, startup procedures, verification process

C.

Budgeting, sequencing, scheduling, documentation

D.

Sequencing, scheduling, documentation, verification procedures

Buy Now
Questions 16

An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?

Options:

A.

Designer of record

B.

Agency CM

C.

Contractor

D.

Owner

Buy Now
Questions 17

While conducting an inspection of the work in progress for a design-bid-build project, a CM notices that some of the completed work does not conform to the construction documents. The FIRST thing the CM should do is

Options:

A.

document the non-conforming work and distribute the documentation to the contractor, design professional, and client.

B.

discuss the concerns with the owner.

C.

direct the contractor to correct the non-conforming work.

D.

schedule a meeting with the design professionals and the client to discuss the issues.

Buy Now
Questions 18

The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non-conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?

Options:

A.

Based on the engineer of record's recommendation, the contractor should develop a repair detail and submit for approval.

B.

The concrete should be chopped out, rebar dowels should be drilled into the new slab, and the repair detail should be implemented.

C.

The agency should accept as-is and rely on the primary system.

D.

All slab concrete should be removed.

Buy Now
Questions 19

A CM is milling and paving a 2-mile-long bridge with a surface that is in total failure. The owner gave the contractor October 24 as the fixed completion date. Meanwhile, the owner has promised the public that work hours would be 7am–7pm, 5 days per week and that the bridge would be completed by September 1.

The bridge deck is poured on a steel grid deck, but this type of operation has never been performed in the state and complications from weather have slowed progress. The contractor has requested to work nonstop 24/7 to meet the deadline told to the public.

The CM should

Options:

A.

tell the contractor they have until September 1 and can only work 7am–7pm.

B.

discuss with the owner and tell the contractor to do only 1/2 of the bridge.

C.

meet with the owner and contractor to vet all issues/options and make a decision.

D.

meet with the contractor to go over realistic time frames and make a decision.

Buy Now
Exam Code: Construction-Manager
Exam Name: Certified Construction Manager (CCM)
Last Update: Oct 18, 2025
Questions: 65
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now Construction-Manager