You are working on an internet banking project. Your company is offering this product to the financial market. For each new customer, some customization will typically be needed. To make the product successful there is a strong focus during development on a reliable and maintainable architecture. To support architectural reviews, a checklist will be developed. Within the checklist specific sections will be attributed to reliability and maintainability.
Which question from the list below should you include in the maintainability section of the architectural review checklist?
Which of the following is a generic risk factor that should be considered by a Technical Test Analyst during a product risk analysis?
Which of the following statements BEST describes how tools support model-based testing?
Within an embedded software project, the maintainability of the software is considered to be critical. It has been decided to use static analysis on each delivered software component.
Which of the following metrics is NOT a maintainability metric typically used with static analysis?
Which of the following statements about performance testing tools is NOT correct?
A new web site has been launched for a testing conference. There are a number of links to other related web sites for information purposes. Participants like the new site but complaints are being made that some (not all) of the links to other sites do not work.
Which type of test tool is most appropriate in helping to identify the causes of these failures?
Consider the following control flow graph:
The control flow represents a software component of a car navigation system. Within the project the maximum cyclomatic complexity to be allowed is set at 5.
Which of the following statements is correct?
You are involved in testing a system in the medical domain. Testing needs to comply with the FDA requirements and is rated as being safety critical. A product risk assessment has been performed and various mitigation actions have been identified. Reliability testing is one of the test types that needs to be performed throughout the development lifecycle.
Based on the information provided, which of the following activities would need to be addressed in the test plan?
Consider the following specification:
If you are flying with an economy ticket, there is a possibility that you may get upgraded to business class, especially if you hold a gold card in the airline’s frequent flier program. If you don’t hold a gold card, there is a possibility that you will get ‘bumped’ off the flight if it is full when you check in late.
This is shown in the control flow graph below. Note that each box (i.e., statement, decision) has been numbered.
Three tests have been run:
Test 1: Gold card holder who gets upgraded to business class
Test 2: Non-gold card holder who stays in economy
Test 3: A person who is bumped from the flight
What is the level of decision coverage achieved by these three tests?